5 participants have been placed in the top 11 in the designated region, Europe, CIS, Middle East and Africa. Participants had 24 hours to produce a grade of steel meeting technical requirements at the lowest cost per tonne.

Emirates Steel Arkan – Steel Unit is scheduled for a ResponsibleSteel Stage 2 Audit with UK CARES from September 9, 2024, to September 13, 2024